Friday, December 5, 2008

What Is The When Camera Up Uteris

floor joists

new stage in the construction, installation of concrete floor upstairs. We must first place concrete beams evenly spaced every 60cm. They bear on the chaining of the double wall bearing walls. According to the arrangement of these walls there are four areas to "dress up" and two of them beams have nearly 6m long ... So very very heavy. Our team decided to start with them.

This is the top of the garage, you can see from the gap with the middle of the wall that are prestressed beams is a slight bend to bear by weight of the screed:

ettayƩes beams are seen at the center of their length and charge ahead:

The second area relates to the stay, it's impressive that length. That it took the lift to the force of arms. I do not understand why a mechanical lift was not planned:

Next photo lets see what the future look like polystyrene slabs / timber that will take place between the joists

top view is also nice: