As agreed, the pump for conveying concrete to a height of 2.50m came in early afternoon with a first load of 5m3 to cover only a portion of the surface.

A technique for implementing well-established, with the conductor at the inlet pipe and two musicians rake.

A second router 7m3 concrete may be necessary there will not be a drop.

Meanwhile below, are the great waters, a real pool. Despite the load, the deformed slabs holding up

After pulling and smoothing of the slab, the final result: