Since Tuesday, carpenters arrived. They occur for two days to several items from the site.
First, implementation of door frame to DRC. plaster tiles will be mounted around later.
Sub faces PVC outside are also in place. The white color goes well with the joints and brick.
And in the series bow window in crisis, it continues: small problem of parallelism, but it should, I said it does, can be arranged.
Third mission, installing windows, door and windows.
First seen from the inside to the floor and then stay.
uh, there would not be a bug the height of the bays? No luck lacks 15cm in height. They are not sealed like other pending replacement. It's odd but I did not even upset :-).
Friday a subcontractor is to install sectional garage door . The installer reassures me by telling me he had come to take measurements before manufacturing. Thus everything goes perfectly .
So to have fun, I suggest a small tour owner to appreciate all the work.
bad that the front door with the final third is not yet arisen but it is probably safer.