Houlala , I would be dropped a bit on what happens over the bow window. As expected
a beam had to be shuttered over it, and to maintain the level, five additional rows of bricks on the rest of the facade had to be bricked.
a beam had to be shuttered over it, and to maintain the level, five additional rows of bricks on the rest of the facade had to be bricked.
If I understand this bund must allow bear part of the frame and set up The break above the bow window.
But where I lost it there in the corner: Strange this thread that gives the slope at 45 degrees and just behind the crow does not stop mount and straight!
it must be my flu that keeps me from thinking, but when it gets better I take it all ;-)
0 comments:
Post a Comment